Projects
SALVADOR
1 Plug strip front bench
2 Sandblasting setup
3 40 ft Strip fence
4 Bathroom heater
5 Gator glove box
6 Bathroom faucet upstairs
7 Patchen pressure pump switch
8 Sprinkler repair
9 Cable railing
10 Hot tub faucet
11 ConX winch
12 Hook up Airstream water – power
13 Replace Vice at shop
14 Rancho saw shed door
15 saw concrete patchen barn
16 Polyjohn stage
House heating vents
2nd water heater
GERMAN (2 days / week)
Plant thyme
Rancho clean up
Casita septic & porta potty
Trash (both farms)
Dump runs ???
Rancho wood splitting area
Weeds
Concrete to new parking
Salvage redwood railing in upper lot
Restack bricks upper lot
Clean fill Hot tub
Upper lot Firewood
Melody clean up
VINCE
Wiring Old Casita
Rancho meters
SJWC
![]()

Salvador: This log is redwood, and it goes into the streambed with the backhoe. We also need one more redwood log from the pile to go with this one. Both get wrapped around a large rock just above the flat area where the stream approaches the Old Highway. The second log needs to be cut shorter, and I want a few rounds off the large end.
The lower area

Salvador: We need a big rock for a dam next to this tree.

German: Cut off all branches

German: Move firewood to parking area against the bank.
![]()
Top of Page
Phase I
Top of Page
Phase I
Phase I
Top of Page
